You probably already know that a new floor can breathe new life into your Florida home. Hardwood floors bring natural elegance to a space, infusing your home with warmth and light and highlighting its aesthetics. The installation process, however, is probably a mystery to most laymen. We’re here to provide answers about the timeline of flooring installation Fort Lauderdale homeowners want to know.
What Is The Flooring Installation Process?
Every project is different, so timelines vary – but the general process remains the same. Most hardwood floor installations take around 7-10 days, with 1 to 3 days spent on the actual installation and an additional seven days to allow the hardwood to acclimate to your home. Here’s a breakdown of the steps taken in installing a hardwood floor and how it affects the timeframe.
1. Acclimatization
Acclimatization is the process of adjusting the moisture of hardwood planks to the environment of your home. After removing existing flooring, we clean and assess the subfloor, then expose the hardwood planks to your home for five to ten days to allow the wood to acclimatize.
2. Installation
A two-person team can typically cover 750 to 1,000 square feet per day, so the typical home of 1,000 to 1,500 square feet can typically be covered in 1-3 days. However, the more complex the home is, the longer it will take – for example, if your house is filled with fixtures, fireplaces, cabinets, and staircases, we’ll have to do more work. Moreover, if you’re going for a more intricate pattern like herringbone or parquet, it can take two to three times longer.
3. Drying and curing
Depending on the type of finish and the environmental conditions, drying and curing can take 1-5 days. Fort Lauderdale homes are often quite humid due to the South Florida weather and the process may take longer.
Different finishes also have different drying times; polyurethane-based flooring dries more rapidly than oil-based flooring, for example.
4. Finishing
After the hardwood floors have fully cured and cleaned of all debris and dust, we apply a special finish. This process involves applying multiple coats, allowing them to dry after each application, and can take anywhere from 1-3 days. Our team pays special attention to details and uses this time to fix any imperfections to ensure a uniform, flawless finish.
What Are Some Factors That Impact The Installation Timeline?
Beautiful, polished hardwood floors take time, and there are a variety of factors that may impact how long the project takes. Though as experienced installers we typically stay on schedule, it’s normal for any installation to encounter delays. Here are some factors that could impact how long it takes to install a floor in Fort Lauderdale, FL:
- Size of the project: Installing a floor in a small bedroom typically only takes a day or two, whereas a large-scale project like an open floor plan or a whole apartment can take a week.
- Type of flooring: Solid hardwood takes more time as it requires a few days to adjust to the environment, whereas engineered hardwood doesn’t need as much time to adjust.
- Type of finish: Unfinished floors take longer than pre-finished floors, which come with finishes already applied.
We Provide Flooring Installation Fort Lauderdale Homeowners Trust
Javier’s Painting and Handyman Services has been servicing commercial and residential properties in the South Florida area for decades. We’ve installed beautiful hardwood floors from Edgewood and Flagler Village to Golden Heights and Harbor Beach. Contact Javier’s Painting and Handyman Services for flooring installation Fort Lauderdale residents love today!